How to Prepare Your Site for a Concrete Pump
A pumped pour goes smoothly when the site is ready before the pump and the concrete arrive. Most of it is simple: somewhere to park, a clear route for the pipeline and the pour ready to go. Here’s what we look for when we turn up with our line pump.
1. Somewhere for the pump and the mixer to park
The pump and the ready-mix lorry need to park next to each other, usually on the road or the drive. Check for parking restrictions, narrow lanes and low branches or cables. If the road is busy or the spot is tight, tell us when you book so we can plan around it.
2. A clear route for the pipeline
The concrete travels through a pipeline from the pump to the pour, so the route needs to be clear. Move skips, materials, bins and vehicles out of the way, and open any gates. We run up to 90m of pipeline, along side passages, down garden paths and over fences where needed.
If the pipeline is going through a house, preparing the route is the builder’s responsibility. Protect the walkways before we arrive. Our operator checks the route before laying the pipeline and will suggest changes if anything needs extra protection.
3. The pour ready to go
Have the formwork, steel and membrane in place and checked before the pump arrives, and make sure Building Control or your engineer has signed off anything that needs it. A pump can place concrete quickly, so the finishing crew needs to be on site and ready with their tools.
4. Concrete ordered for the right time
You order your own ready-mix concrete from your supplier. We’re happy to help you source it or point you in the right direction. Tell your supplier the concrete is being pumped so they can supply a suitable pumpable mix, and line up the delivery times with the pump booking.
5. A washout spot
At the end of the pour, the pump and pipeline are cleaned out. Agree a spot on site where the washout can go, away from drains and finished surfaces.
What we’ll ask when you book
- The site address and where the pump can park
- Roughly how far it is from the road to the pour
- How much concrete is going in and what it’s for
- Whether the pipeline needs to go through a house or over anything
Photos of the access and the pour area help us plan the job before we arrive. Every pump comes with one of our fully qualified and competent operators, who sets up the pipeline and runs the pour.
Frequently asked questions
Does the pump need to be next to the pour?
No. The pump stays by the road with the mixer, and the pipeline carries the concrete to the pour, up to 90m away.
Who supplies the concrete?
You order the ready-mix from your supplier. We can help you source it if you need a hand. Tell them it’s being pumped so they send a pumpable mix.
Who protects the house if you pump through it?
The builder prepares and protects the walkways before the pour. Our operator checks them on the day.
What happens to the washout?
We clean the pump and pipeline at the end of the pour. Agree a washout spot on site, away from drains.
Call 07701 358581 or use the contact form to talk through your site. You can also read can a concrete pump reach my back garden? and how much concrete a line pump can place per hour.